Scale and Rate Problems - SSAT Upper Level Quantitative
- A machine produces widgets at a rate that varies throughout the day. In the first hours, it produces widgets. In the next hours, its rate increases by . How many widgets does it produce during those hours? Answer: widgets Initial rate: widgets per hour. The rate increases by , so new rate widgets per hour. In hours at this rate: widgets. Choice A incorrectly uses the original rate for hours: . Choice C incorrectly calculates . Choice D uses an incorrect rate of widgets per hour.
- A recipe that serves people calls for cups of flour. If you want to serve people but only have cups of flour available, what is the maximum number of people you can actually serve with the flour you have? Answer: people When you encounter recipe scaling problems, you need to work with ratios and proportions. The key insight is finding how much flour is needed per person, then determining how many people your available flour can serve. First, let's find the flour needed per person. The recipe serves 6 people with cups of flour. Converting to an improper fraction: cups. So each person needs cups of flour. Now, with cups available, let's see how many people we can serve. Converting: cups. Dividing by the per-person amount: people. Since you can't serve a fraction of a person, you can serve a maximum of 12 people. Choice (A) 15 people would require cups—more than you have. Choice (B) 13 people would need cups—still too much. Choice (C) 14 people would require cups—way more than available. Choice (D) 12 people needs exactly cups, which is less than your cups. Remember: in "maximum" problems, always round down to the nearest whole number when dealing with people or discrete items.
- A map has a scale where inches represents miles. If two cities are inches apart on the map, and a car travels between them at an average speed of miles per hour, how long will the trip take? Answer: hour minutes First, find the actual distance: miles. Then find the time: hours hour minutes. Choice B uses incorrect scale calculation ( miles directly). Choice C incorrectly calculates instead of . Choice D uses miles.
- A photograph measuring inches by inches is enlarged so that its area becomes square inches. If the enlargement maintains the same proportions, what are the dimensions of the enlarged photograph? Answer: inches by inches The original area is square inches. The area grows by a factor of , and since area scales with the square of the length factor, each side is multiplied by . The new dimensions are inches and inches, and square inches. by also has an area of 150, but does not equal , so the proportions change. by doubles each side, for an area of only 96. by triples each side, for an area of 216. Strategy tip: When an enlargement keeps its proportions, find the length factor from the square root of the area factor, then check both the area and the ratio of the sides.
- A model train is built to a scale of . If the model locomotive is inches long, and the real locomotive travels miles in hours minutes, what is the speed of the real locomotive in miles per hour? Answer: mph The scale information and model length are red herrings - they don't affect the speed calculation. The real locomotive travels miles in hours minutes. Convert time: hours minutes hours. Speed mph. Choice A incorrectly uses hours instead of hours. Choice C uses hours instead of hours. Choice D uses hours, ignoring the extra minutes.
- A contractor estimates that workers can complete a job in days. After days, workers are reassigned to another project. Assuming all workers work at the same rate, how many additional days will it take the remaining workers to finish the job? Answer: days When you encounter work rate problems, think in terms of total work units and how they're distributed over time. The key insight is that work rate remains constant per worker. First, calculate the total work needed. If 8 workers complete the job in 15 days, the total work equals worker-days. Next, determine how much work gets completed in the first 6 days. With 8 workers working for 6 days, that's worker-days of completed work. This leaves worker-days of remaining work. After 6 days, 2 workers are reassigned, leaving workers. To find how long these 6 workers need to complete the remaining 72 worker-days of work: days. Looking at the wrong answers: Choice (A) 18 days likely comes from incorrectly calculating workers instead of 6. Choice (B) 15 days represents the original timeline, ignoring both the work already completed and the reduced workforce. Choice (D) 21 days might result from adding the original 15 days to the 6 days already worked, which double-counts the time. The correct answer is (C) 12 days. Strategy tip: In work rate problems, always convert to total work units first (worker-days, worker-hours, etc.), then track what's completed versus what remains. This systematic approach prevents confusion when workforce size changes mid-project.