What Is Risk Management?
In physical therapy, risk management is the proactive process of identifying, evaluating, and reducing hazards that could harm patients, clinicians, or the clinical environment.
Three Domains of Safety
The Risk Matrix
Hierarchy of Controls
The Risk-Reduction Principle
If a fall-risk control reduces likelihood by 80%, then \( E = 0.8 \) and residual risk drops to \( 0.2 \times R_{\text{initial}} \). Higher \( E \) means safer practice. The clinician's duty is to reach the lowest reasonably practicable residual risk.
Hazard vs. Risk
Applying a Safety Workflow
Example 1: Fall Prevention
A post-stroke patient with impaired balance is starting gait training. Likelihood of a fall is high and severity could be a fracture.
Example 2: Practitioner Injury
A therapist must transfer a dependent patient from bed to chair. Repeated manual lifting risks a back injury — a high-severity, high-likelihood hazard for the clinician.
Example 3: Vital-Sign Red Flag
During exercise, a patient's resting heart rate climbs and they report chest tightness with \( \text{RPE} = 8/10 \). This signals an unsafe physiologic response.
Common Mistakes
Controls Summary
| Example | Effectiveness | |
|---|---|---|
| Elimination | Remove a tripping hazard | Highest |
| Engineering | Mechanical lift, ramps | High |
| Administrative | Protocols, training, signage | Moderate |
| PPE | Gloves, gowns, masks | Lowest |
Question 1 of 5
Which control is considered the most effective in the hierarchy of controls?
Question 2 of 5
A control reduces fall likelihood by 60%, so \( E = 0.6 \). What is the residual risk relative to initial risk?
Question 3 of 5
A patient develops chest tightness and abnormal vitals during exercise. What is the most appropriate first action?
Question 4 of 5
Which best describes the difference between a hazard and a risk?
Question 5 of 5
For transferring a fully dependent patient, which option is the highest-tier control to prevent practitioner injury?