A manager is preparing a flexible budget. The cost of electricity is a mixed cost, with a significant fixed component and a smaller variable component driven by machine hours. The manager misclassifies the entire cost as purely variable based on the average cost at the planned activity level. What is the most likely consequence if the actual activity level is 15% lower than the planned level?