Solve Two Part Logic - GMAT Data Insights
- A pharmaceutical company conducts a two-phase clinical trial. In Phase 1, of participants show positive response to treatment. In Phase 2, only participants who showed positive response in Phase 1 continue, and of these show continued positive response. If participants started Phase 1, and the company needs at least participants with positive responses in both phases for regulatory approval, how many additional Phase 1 participants would be needed if the current number falls short, and what is the current number of participants with positive responses in both phases? Answer: Current success: ; additional needed: Phase 1 participants Phase 1 positive: 180 × 0.6 = 108 participants. Phase 2 positive (from those who were Phase 1 positive): 108 × 0.75 = 81 participants. Since 81 < 90, we need 9 more successful participants. If we add n Phase 1 participants, we get n × 0.6 × 0.75 = 0.45n additional successes. To get 9 more: 0.45n = 9, so n = 20. Choice B miscalculates by using only the Phase 2 success rate (9/0.75 = 12). Choice C incorrectly counts Phase 1 successes as the final number. Choice D incorrectly counts all Phase 1 successes plus Phase 2 successes.
- Machines A and B together finish a job in 4 hours. A alone takes 6 hours longer than B. Find their solo times (A, B). Answer: 12 h, 6 h Set B's solo time as b. Then A's is b + 6. Combined rate: 1/(b + 6) + 1/b = 1/4. Solving gives - 2b - 24 = 0, so b = 6 and A = 12. The trap is 6 h, 12 h: it gives the same 4-hour combined rate but reverses the condition that A takes 6 hours longer than B.
- A class of 40 has boys averaging 90 and girls 70. The class average is 82. Find boys and girls. Answer: 24 boys, 16 girls Set boys = b, so girls = 40 - b. Total score is 90b + 70(40 - b) = 40 * 82 = 3280, which gives 20b + 2800 = 3280, so b = 24 and girls = 16. The tempting wrong answer is 16 boys, 24 girls, but that would average 78, and since 82 is closer to 90 than 70, boys must outnumber girls.
- In a two-stage quality control process, products must pass both Stage 1 and Stage 2 to be approved. Let be the probability that a randomly selected product passes Stage 1, and let be the probability that a product that has passed Stage 1 also passes Stage 2. If the overall approval rate is and the Stage 1 pass rate is , what is the conditional probability , and what would be the new overall approval rate if Stage 1 pass rate increased to while remained constant? Answer: ; new overall rate = The overall approval rate equals P(Stage 1) × P(Stage 2|Stage 1) = p × q. Given: 0.6 × q = 0.36, so q = 0.36/0.6 = 0.6. With the new Stage 1 rate of 0.8 and q remaining 0.6, the new overall rate = 0.8 × 0.6 = 0.48. Choice B incorrectly adds the improvements rather than multiplying. Choice C miscalculates q as 0.36 - 0.6 = -0.24, then uses |−0.24| = 0.24, but realizes this is wrong and guesses 0.45. Choice D assumes the overall rate cannot change if only one stage changes.
- Positive integers and satisfy and . Find and . Answer: 13, 7 Factor - as (x + y)(x - y). Since x + y = 20, you have 20(x - y) = 120, so x - y = 6. Add x + y = 20 and x - y = 6 to get 2x = 26, so x = 13 and y = 7. The tempting swap 7, 13 gives x - y = -6, making - = -120, not 120.
- Process M produces units per hour while consuming units of raw material per hour. Process N produces units per hour while consuming units of raw material per hour, where is an efficiency parameter. If the firm has units of raw material available per hour and needs to produce at least units per hour, what is the minimum value of required, and what will be the total hourly production at this minimum value? Answer: ; total production = units per hour Both processes run simultaneously. Total production = (4y + 3) + (3y + 8) = 7y + 11. Total material consumption = (2y + 1) + (y + 4) = 3y + 5. Constraints: (1) Material limit: 3y + 5 ≤ 45, so 3y ≤ 40, thus y ≤ 13.33. (2) Production requirement: 7y + 11 ≥ 65, so 7y ≥ 54, thus y ≥ 7.71. Since y must be an integer, minimum y = 8. At y = 8: production = 7(8) + 11 = 67, material use = 3(8) + 5 = 29 ≤ 45 ✓. Choice B has y = 6 < 7.71 (insufficient production). Choice C has y = 7 < 7.71 (insufficient production). Choice D has y = 9 > 8 (not minimum).
- A two-digit number's digits sum to 9; reversing yields of original. Find tens and units digits. Answer: 6, 3 Let the tens digit be t and the units digit be u. The original number is 10t+u, and its reverse is 10u+t. Since the reverse is 4/7 of the original, 7(10u+t)=4(10t+u), so 70u+7t=40t+4u, giving 66u=33t, or t=2u. With t+u=9, u=3 and t=6. The tempting trap is 3,6, because that makes the reverse 63, which is 7/4 of the original, not 4/7.
- A software company has two development teams working on separate modules of a project. Team Alpha can complete their module in days, while Team Beta can complete their module in days, where represents the baseline development time. The project manager wants both modules completed within days, and Team Alpha must finish at least days before Team Beta to allow for integration testing. What is the maximum value of that satisfies these constraints, and how many days will Team Beta actually take at this maximum value? Answer: ; Team Beta takes days We have three constraints: (1) Team Alpha finishes within 12 days: d - 3 ≤ 12, so d ≤ 15. (2) Team Beta finishes within 12 days: d + 2 ≤ 12, so d ≤ 10. (3) Alpha finishes at least 2 days before Beta: (d + 2) - (d - 3) ≥ 2, which gives 5 ≥ 2 (always satisfied). The binding constraint is d ≤ 10, so maximum d = 10. At d = 10: Team Alpha takes 7 days, Team Beta takes 12 days. Choice A violates constraint (2). Choice B violates constraint (2). Choice C violates constraint (2). Only choice D satisfies all constraints.