Revisions in
Autodesk Revit
Master revision clouds, revision schedules, and the process of issuing sheets: the essential BIM documentation workflow.
What Are Revisions?
In construction documentation, a revision is a formal change made to a previously issued drawing set. Revit tracks these changes so every stakeholder knows what changed, when it changed, and why.
The Three Pillars of Revit Revisions
Why Revisions Matter
Revisions are not just bookkeeping: they are a legal record of design changes. In the AEC industry, accurate revision tracking can prevent costly construction errors and contractual disputes.
The Revision Workflow
Creating Revision Entries
Numbering: Per Project vs Per Sheet
Drawing Revision Clouds
Cloud Properties and Tags
Every revision cloud has key properties you can control:
The Revision Schedule on Title Blocks
Issuing a Sheet
When you issue a revision, Revit locks its clouds so they cannot be moved, deleted, or edited. This preserves the legal record of what was issued.
Cloud Visibility Options
Each revision entry has a visibility dropdown that controls how its clouds render on sheets:
How to Apply: Full Workflow
Example 1: Simple Door Relocation
A client requests that a door on sheet A101 be moved 3 feet to the east. Here's how we handle the revision:
Example 2: Multiple Clouds, One Revision
A structural engineer adds two new columns to a floor plan. Both changes belong to Revision 2, so we draw two separate clouds assigned to the same revision entry.
Example 3: Issued Revision + New Changes
After issuing Revision 1, the client requests another change. You cannot edit the existing clouds because they are locked. Instead:
Common Mistakes
Revision Quick Reference
| Feature | Before Issuing | After Issuing |
|---|---|---|
| Edit Clouds | ✓ Fully editable | ✕ Locked / Read-only |
| Delete Clouds | ✓ Can delete | ✕ Cannot delete |
| Add New Clouds | ✓ To this revision | Must use new revision |
| Change Visibility | ✓ Cloud+Tag / Tag / None | ✓ Still adjustable |
| Schedule Entry | Shows with current data | Permanently recorded |
| Un-issue | N/A | Possible but risky |
Key Takeaways
Question 1 of 5
Where do you create a new revision entry in Autodesk Revit?
Question 2 of 5
What happens to revision clouds after a revision is issued?
Question 3 of 5
If you need to reduce visual clutter from old revision clouds while keeping the revision in the schedule, what should you do?
Question 4 of 5
In the "Per Sheet" numbering mode, how are revision numbers assigned?
Question 5 of 5
You draw three revision clouds on different views of the same sheet, all assigned to Revision 2. How many rows will appear in the title block's revision schedule for Revision 2?