Naming
Conventions in Revit
Master the art of consistent, clear naming for views, sheets, and worksets: the foundation of every well-organized BIM project.
Why Naming Matters
A Revit project can contain hundreds of views, dozens of sheets, and multiple worksets. Without a naming system, team members waste time searching, duplicate work, and introduce costly errors during construction documentation.
The Three Core Elements
Anatomy of a Good Name
Every name follows a segmented pattern separated by hyphens or underscores. Each segment encodes one piece of metadata, so the name is both human-readable and sortable in the Project Browser.
The Golden Rule of Naming
View Naming Convention
Sheet Naming Convention
Sheets follow the NCS (National CAD Standard) or your firm's variant. The discipline letter sorts sheets by trade. The series number groups sheet types (1 = plans, 2 = elevations, 3 = sections, 5 = details). The sequence orders them within the set.
Common Sheet Codes
| Discipline | Code | Example Sheet | Description |
|---|---|---|---|
| Architectural | A | A1.01 | Floor Plans |
| Structural | S | S2.01 | Elevations |
| Mechanical | M | M5.03 | HVAC Details |
| Electrical | E | E1.02 | Lighting Plans |
| Plumbing | P | P3.01 | Plumbing Sections |
Workset Naming Convention
Views vs. Sheets vs. Worksets
| Feature | Views | Sheets | Worksets |
|---|---|---|---|
| Purpose | Design + draft | Print + issue | Ownership + visibility |
| Name Pattern | Type-Level-Desc-Purpose | Disc.Series.Seq | Category-System |
| Separator | Hyphen - | Period . | Hyphen - |
| Sortable By | View type | Discipline + series | Discipline + system |
| Typical Count | 100 - 500+ | 50 - 200+ | 10 - 30 |
How to Apply the Convention
Example 1: Naming a Floor Plan View
Scenario: You are creating a working drawing view of the Level 3 floor plan for the east wing of a school.
Example 2: Naming a Sheet
Scenario: You need to issue the second architectural section sheet for a hospital project.
Example 3: Setting Up Worksets
Scenario: A new workshared model for a mixed-use building. You need to create the initial workset list.
Common Mistakes
Summary: Quick Reference
| Element | Pattern | Example |
|---|---|---|
| Floor Plan View | FP-Level-Desc-Purpose | FP-L01-Overall-WD |
| Section View | SEC-Dir-Desc-Purpose | SEC-Long-Atrium-CD |
| Elevation View | ELV-Face-Type-Purpose | ELV-North-Ext-CD |
| 3D View | 3D-Desc-Purpose | 3D-Lobby-PRES |
| Sheet | Disc.Series.Seq | A1.01 |
| Workset | CAT-System | ARCH-Exterior Shell |
Question 1 of 5
A properly named floor plan view in Revit should begin with which abbreviation?
Question 2 of 5
In the sheet number S2.03, what does the "S" represent?
Question 3 of 5
Which of the following is the best workset name for exterior wall elements?
Question 4 of 5
Why is the purpose tag (WD, CD, PRES) important at the end of a view name?
Question 5 of 5
A colleague names a view "Copy of Level 1". What is the primary problem with this name?