01 / 21

Interference
Checks

Learn how to identify and resolve spatial conflicts between building elements in Autodesk Revit before they become costly construction errors.

Autodesk Revit

What Is an Interference Check?

An interference check (also called clash detection) is an automated process that scans a building model to find places where two or more elements occupy the same physical space. In the real world, a steel beam cannot pass through an HVAC duct: the interference check catches that conflict on screen so you can fix it before construction begins.

Why They Matter

★ Save Money
Catching a clash in the model costs nearly nothing. Fixing one on the job site can cost thousands of dollars in labor and materials.
★ Save Time
Rework on-site delays the schedule. Digital clash resolution keeps the project timeline intact.
★ Improve Safety
Undetected clashes can compromise structural integrity or block emergency pathways.

Key Terminology

Hard Clash
Two solid elements physically overlap: a pipe passing through a beam.
Soft Clash
An element violates a required clearance zone, such as maintenance access space around equipment.
Workflow Clash
A scheduling or sequencing conflict: two trades scheduled to work in the same space at the same time.

The Core Rule of Clash Detection

Element A (Structural Beam) Element B (Duct) Overlap
\( \text{Volume} > 0 \)
If bounding volumes intersect → CLASH The interference region (amber) is the shared space

How Revit Computes Intersections

Select Two Categories Bounding Box Pre-Filter Precise Geometry Test Report Clash Pairs

Hard vs Soft Clashes

Hard Clash Soft Clash
Definition Two solids physically overlap An element invades a clearance zone
Example Pipe through structural beam Equipment too close to a wall for maintenance
Severity Critical: cannot build Warning: code or access issue
Revit Detection Built-in Interference Check Requires clearance parameter or Navisworks
Resolution Move, resize, or reroute one element Adjust placement or revise clearance rule

How to Run the Check

1
Open the Collaborate tab. Navigate to the Coordinate panel in the Revit ribbon.
2
Click "Interference Check" and choose "Run Interference Check."
3
Select Category A (e.g., Structural Framing) in the left pane and Category B (e.g., Mechanical Equipment) in the right pane.
4
Click OK. Revit scans the model and presents a report listing every clashing pair with element IDs.
5
Review each clash. Select a row to zoom to the conflict in the 3D view, then resolve by moving, resizing, or adding a penetration.

Selecting the Right Categories

The interference check dialog lets you pick any two Revit categories to compare. Choosing the right pairing is essential: checking everything against everything generates too much noise, while a narrow selection might miss real problems.

★ High Priority
Structural vs Mechanical, Structural vs Plumbing, Structural vs Electrical: these clashes are the hardest to fix on-site.
★ Medium Priority
Mechanical vs Plumbing, Mechanical vs Electrical: routing conflicts that require coordination.
★ Routine
Walls vs Ducts, Floors vs Pipes: common penetrations often handled with sleeves or fire stops.

Example 1: Beam vs Duct

W12x26 Steel Beam 24" Duct CLASH Hard clash detected

Example 2: Multi-System Conflict

Floor Slab Beam Supply Duct Pipe Clash 1 Clash 2 One pipe creates two separate clashes Each must be resolved independently

Example 3: Linked Model Clashes

Architectural Model Wall MEP Model (Linked) Hot Water Pipe Pipe from linked MEP model penetrates host wall

Reading the Report

Element A / Element B
Each row shows the two clashing elements by category, family, type, and Element ID.
Show Button
Clicking "Show" zooms the 3D view to the exact location of the conflict and highlights both elements.
1
Sort by category pair to group related clashes together (e.g., all Structural vs Mechanical).
2
Export to HTML for sharing with the team: Revit generates a formatted table you can email or print.
3
Re-run after fixes to verify that resolved clashes no longer appear and no new ones were introduced.

Resolution Strategies

★ Reroute
Move the MEP element to a different path that avoids the structural member entirely.
★ Resize
Reduce duct or pipe size (if allowed by load calculations) so it fits in the available space.
★ Add Penetration
Create a sleeve or opening in the structural element (requires engineer approval).
★ Redesign
When no simple fix works, modify the structural layout or ceiling height. Last resort.

Common Mistakes

✕ Ignoring Linked Models
Running checks only within the host model misses cross-discipline clashes, which are the most common on real projects.
✕ Checking Too Late
Waiting until the model is nearly complete creates a massive list of clashes that is overwhelming to resolve under deadline pressure.
✕ Accepting All Clashes
Dismissing clashes as "they'll figure it out on-site" defeats the purpose of BIM coordination.

Clash Detection Summary

Revit Built-In Navisworks
Clash Types Hard clashes only Hard, soft, and workflow
Linked Models Yes (one link at a time) Yes (multiple files)
Tolerance Settings None (exact overlap) Adjustable clearance
Report Export HTML table XML, HTML, tabular
Best For Quick single-discipline checks Full project coordination

Question 1 of 5

What does an interference check in Revit primarily detect?

Question 2 of 5

A soft clash differs from a hard clash because it involves:

Question 3 of 5

Where do you find the Interference Check command in Revit?

Question 4 of 5

A single plumbing pipe passes through both a duct and a beam. How many clashes will the interference report show?

Question 5 of 5

Which is the best practice for when to run interference checks during a project?