01 / 21

Copy/Monitor
Coordination Elements

Learn how to use Revit's Copy/Monitor tool to keep levels and grids synchronized across linked models for seamless multi-discipline coordination.

Autodesk Revit

What Is Copy/Monitor?

Copy/Monitor is a coordination tool in Autodesk Revit that lets you create a copy of an element from a linked model into your current project, then continuously monitor the original for changes. If the original element moves or is renamed, Revit alerts you with a coordination review warning so you can decide how to respond.

Why Coordination Matters

★ Consistency
All disciplines share the same levels and grids, preventing misalignment between architectural, structural, and MEP models.
★ Early Alerts
When a linked model changes a monitored element, you receive an immediate notification rather than discovering errors at construction.
★ Accountability
Coordination Review creates a documented record of what changed, who changed it, and what action your team took in response.

Key Terms to Know

1
Linked Model: An external Revit file attached to your project using Revit Link. It is read-only in your project.
2
Copy: Creates a duplicate of an element from the linked model into your current project. The copy is editable in your file.
3
Monitor: Establishes a persistent relationship between your copied element and the original in the linked model.
4
Coordination Review: The dialog that appears when monitored elements differ. You can accept, reject, or postpone each change.

Which Elements Can Be Copy/Monitored?

Copy/Monitor Levels Grids Columns Walls Floors Most common (this lesson) Also supported

The Core Workflow

1. Link Model Insert > Link Revit 2. Copy/Monitor Collaborate tab 3. Select Elements Click levels/grids 4. Finish Click Finish Revit now monitors the linked elements for changes

Copy vs Monitor Only

Copy + Monitor Monitor Only
Creates new element? Yes: duplicates into your project No: watches an existing match
When to use Starting a new project from a linked model Your project already has matching levels/grids
Element ownership Your project owns the copy Your project owns its original element
Coordination Review Triggers on any linked change Triggers on any linked change

How to Copy/Monitor Levels

1
Link the source model: Go to Insert tab → Link Revit. Place the linked model at Shared Coordinates or Origin-to-Origin.
2
Open Copy/Monitor: Navigate to Collaborate tab → Copy/Monitor → Select Link. Click on the linked model in your view.
3
Set options (optional): Click "Options" on the ribbon to configure level naming and offset rules before copying.
4
Choose Copy or Monitor Only: Click "Copy" on the ribbon, then click each level datum in the linked model. A green checkmark appears on monitored elements.
5
Finish the session: Click "Finish" on the ribbon. Revit now tracks these levels for coordination.

How to Copy/Monitor Grids

1
Ensure grids are visible: Open a plan view where the linked model's grids are shown. Adjust Visibility/Graphics if needed.
2
Start Copy/Monitor: Collaborate tab → Copy/Monitor → Select Link → click the link.
3
Click Copy, then select grids: Click each grid line in the linked model. For large grids, use "Copy All" (if available) to batch-select.
4
Finish: Click Finish on the ribbon. Grid names from the source are preserved in your project.

Coordination Review

! Change Detected Accept Update your copy to match the link Reject Keep your version; ignore the change Postpone Defer the decision for a later review Access via: Collaborate → Coordination Review → Select Link Each monitored element is listed with its change type

What Triggers an Alert?

★ Elevation Change
A monitored level is moved up or down in the source model.
★ Name Change
A level or grid is renamed in the linked model.
★ Deletion
The original element is deleted from the linked model entirely.

Example 1: Copying Levels

Structural Model (Link) Level 1 0'-0" Level 2 10'-0" Roof 22'-0" COPY MEP Model (Yours) Level 1 ✓ 0'-0" Level 2 ✓ 10'-0" Roof ✓ 22'-0"

Example 2: Copying Grids with Options

Plan View: Linked Structural Grids 1 2 3 4 A B C Use "Options" to add a prefix/suffix to copied grid names

Example 3: Handling a Change Alert

The structural engineer raises Level 2 from 10'-0" to 12'-0" in their model. When you open your MEP file and run Coordination Review, Revit flags the discrepancy.

Before (Your Model) Level 1: 0'-0" Level 2: 10'-0" Accept After (Updated) Level 1: 0'-0" Level 2: 12'-0" ✓

Common Mistakes

✕ Forgetting to Finish
Not clicking "Finish" on the ribbon leaves Copy/Monitor in an active state. No monitoring relationship is created until you finish the session.
✕ Editing Without Review
Manually moving a monitored level or grid without running Coordination Review first can cause silent desynchronization between your model and the link.
✕ Wrong Positioning
Linking models at "Center-to-Center" instead of "Origin-to-Origin" or "Shared Coordinates" causes all copied elements to be offset from the correct location.

Summary Reference

Action Where to Find It Result
Link Revit Insert tab → Link Revit External model appears in your project
Copy/Monitor Collaborate tab → Copy/Monitor Creates copies with monitoring
Options Ribbon (during C/M session) Configure naming, offsets
Coordination Review Collaborate tab → Coord. Review Accept, Reject, or Postpone changes
Stop Monitoring Right-click monitored element Removes the monitoring link

Question 1 of 5

What is the primary purpose of the Copy/Monitor tool in Revit?

Question 2 of 5

Where do you access the Copy/Monitor tool in the Revit ribbon?

Question 3 of 5

When should you use "Monitor Only" instead of "Copy + Monitor"?

Question 4 of 5

In the Coordination Review dialog, what are the three available actions for a flagged change?

Question 5 of 5

A structural engineer renames "Level 2" to "Second Floor" in their model. What happens in your model that has a Copy/Monitor relationship?